1.Operating Time
May 13th ,2021 - August 13th , 20212
2.Operating Equipment
2 Desilting Equipment
3.Operating Site
Area within following four points:
19°9′16.20″N/110°34′10.08″E;
19°9′04.14″N/110°34′49.20″E;
19°9′01.08″N/110°34′48.12″E;
19°9′13.08″N/110°34′09.00″E。
4.Operation
Desilting for Boao-Xisha Waterway
5.Notes
1)the operation equipment need to be marked with warning signs
2)Passing boats shall be keep shape lookout for safety.
3)No further notice when the operating ends.